Florida Commercial Pool/Spa Contractor Examination Exam Prep
Free practice questions

Free FPSC Practice Questions

10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

The FPSC exam has 80 questions and runs 5 hours.

These 10 free FPSC questions are organized by exam domain, so you can see how each part of the Florida Commercial Pool/Spa Contractor Examination blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: Pre-installation and Site Preparation 5% of exam

Question 1

Excavation equipment has wiped out the original pool corner stakes. A nearby fence was never established as a survey control, but intact batter-board marks remain tied to the surveyed baseline and the project benchmark is undisturbed. Which method gives the most defensible replacement layout?

Show answer & explanation

Correct answer: D - Restore the corner from the surveyed offsets and benchmark, then verify dimensions and diagonals

Domain 2: Pool and Spa Excavation 15% of exam

Question 2

Pocket-penetrometer readings from an 8-foot-deep pool excavation average 1.8 tsf. The soil is cohesive and has no free water, but the competent person observes visible fissures in the exposed face. How should the material be classified for OSHA purposes?

Show answer & explanation

Correct answer: B - Type B, because fissures disqualify otherwise Type A material

Domain 3: Plumbing Work 12.5% of exam

Question 3

At the same pump speed, a public pool's clean-system baseline was 120 GPM with 10 psi on the pump-discharge/filter-inlet gauge. Today flow is 82 GPM, the same gauge reads 18 psi, and suction-side head is 12 feet. Using 2.31 feet of water per psi and adding suction-side head, which result and diagnosis best fit the readings?

Show answer & explanation

Correct answer: C - 53.6 feet TDH; system resistance has increased, such as from a loaded filter

Domain 4: Electrical Work 5% of exam

Question 4

The final electrical inspection of a 2020 NEC installation finds a metallic hardwired circulation-pump motor with an equipment grounding conductor, but no connection at its bonding lug. The installer claims that grounding makes bonding redundant. How should the inspector evaluate that claim?

Show answer & explanation

Correct answer: A - Grounding provides the fault-current path; bonding reduces voltage gradients, so both applicable connections are required

Domain 5: Shell Placement 10% of exam

Question 5

During shotcrete placement at a spa bench, coarse, poorly cemented material accumulates behind the reinforcing at the base of the wall. The nozzleman proposes wetting it and packing it into the bench before covering it. How should the crew handle this material?

Show answer & explanation

Correct answer: B - Remove and discard the rebound, clean the area, and correct the shooting technique

Domain 6: Deck Work 5% of exam

Question 6

Plans for a new public pool show a wet deck draining at a uniform 3.5% cross slope. That slope is within the pool-deck drainage range, but the same strip is designated as the accessible route. Which design revision reconciles the two requirements?

Show answer & explanation

Correct answer: C - Maintain positive drainage while providing an accessible route at no more than 1:48 cross slope

Domain 7: Tile, Coping and Trim Work 10% of exam

Question 7

Twice within a year, the grout joint between a concrete deck and precast coping has cracked along the full perimeter. The deck and shell are otherwise sound, and the joint is intended to accommodate differential movement. Which repair detail addresses the failure mechanism?

Show answer & explanation

Correct answer: D - Remove the rigid filler and install compatible elastomeric sealant over a bond breaker or backer rod

Domain 8: Accessory Work 10% of exam

Question 8

A 52-inch-high public-pool gate opens outward, self-closes, and self-latches. Its release mechanism is on the pool side, 4 inches below the top, and no opening larger than 1/4 inch exists within 20 inches of the release. An inspector objects because the latch is below 54 inches. How should the gate be evaluated?

Show answer & explanation

Correct answer: D - The pool-side alternate can comply because the release is sufficiently below the top and nearby openings are restricted

Domain 9: Interior Surface Preparation and Finishing 5% of exam

Question 9

Three weeks after startup, a dark aggregate finish shows broad color mottling. Sounding is solid, no cracks or material loss are present, and the water-balance log remains within the specified range. Which assessment is best supported?

Show answer & explanation

Correct answer: B - The mottling may be aesthetic placement or hydration variation; document and evaluate it before removal

Domain 10: Start Up 5% of exam

Question 10

For a newly plastered public pool, pH is 7.5. The supplied LSI factors for temperature, calcium hardness, adjusted alkalinity, and TDS are 0.7, 2.2, 2.1, and 12.1. Using LSI = pH + temperature factor + calcium factor + alkalinity factor - TDS factor, the calculated index supports which operating judgment?

Show answer & explanation

Correct answer: C - LSI +0.4; the water has scale-forming tendency, so reduce scale-driving factors in controlled steps

The rest of the FPSC blueprint

The FPSC exam also covers these domains. Drill them in the full free practice test:

That's 10 of 1,030

The full bank has 1,020 more FPSC questions with explanations.

Continue in the free practice test →

View plans